The Slab Is Poured

The cement slab needed for the garage floor at George and Lisa's house was a three day project.  The first day a team came out and spent a couple of hours setting up the forms for the garage floor.  The next day, very early as promised, a big crew showed up and prepared the area and then the cement truck showed up and the slab was started.  It took two loads from the cement truck and about 6 hours work on pouring, smoothing and continual smoothing of the slab.  On the third day, again early, one guy came out and added cuts in the slab.  With that, the slab is almost ready to be built on.  It looks huge but when it is all done George and Lisa will have a great three car garage.