Drainage /Electrical /Moat Project-Day #8.
It is FINISHED!!!! Well mostly finished. I still have probably a month of work left to do to take everything Cory, Tim and I did and complete them in total but the biggest parts of the items on the "last infrastructure project " list are done.
Today we wrapped up moving the remaining Irrigation pipes to the outside of the garden bed. I also had Cory trench from the Pavilion to the barn for running an electrical conduit and wire for future solar power to the barn.
There WAS going to be one more item for Cory and I to tackle but after reviewing the Item it was decided bigger equipment was needed and a longer period of time scheduled. The item was to regrade/slope Turkey Trot which is the road which goes around the outside of our farm. It has rutted out over the years and nears to be sloped and graded to make it better for the future. But,,,, that will be a project for another day.
So.....tomorrow starts the finishing of all the items. Making new electrical connections, raking and grading the front yard, cutting little roots in the expanded Quail Way, etc. There's still a lot to do.......Maybe I should take a day off and go eat ribs instead.......yeah...great idea!!!!
Thank you George, your contributions to the blog have been great. You deserve the ribs!