The Drainage/Electrical/Moat Project-Day #2
Day two of this massive project started the same as day one-cold.....but with a twist.....snow. an early winter snow had started falling on the Francisco Farm
As the snow fell though out the day and the cold going no where, work continued to move forward.
One of the "minor issues" from day one was repaired. All the electrical wires for new the electric connections were run in their underground conduits. About half of drainage pipes were installed and gravel dumped to cover the completed sections of trenches.
After six hours of cold and falling snow and increasingly muddy conditions , this frozen soul had had his fill for the day. A warm and cozy wood stove waited inside and could no longer be ignored. So day two ends with more worked to be completed.....
Thanks George!..